Skip to main content

Expansion Valve fitting and Valve expansion Adjustment

Expansion valve fitting and Adjustment



   We all know the what is Expansion valve and it's operation, If you want know about it click on following link https://lavate456.blogspot.com/2019/10/expansion-valves-expansion-valve-is.html . 
Now we are going to discuss about the Fitting of New Expansion valve and it's expansion setting adjustment.
   Before starting the Fitting procedure of expansion valve we have to check the refrigerant pressure in the system it should be zero as shown in below link.

The valve orientation should like that the head of valve should not be on down side. It should be on top side or horizontal side as shown in below image.

While the soldering do not place open flame on the capillary bulb or near the capillary bulb.

After fitting the expansion valve we have to connect the capillary bulb or external equalizer with the expansion valve.The location of the bulb and equalizer should not be on a vertical line. It should be on a horizontal line after the evaporator or chilling coil connected with expansion valve as shown in below image.

The capillary bulb location on horizontal line should not be on a top or bottom side of line. The location of bulb is shown in below image.

While the soldering we have take some precautions that the flame should not be reach to expansion valve body. The body of expansion valve should remain cold. For that we have to take wet clothe and keep it on expansion valve while soldering as shown in below image.

After the all fitting of expansion valve we have to check the expansion valve superheat or expansion adjustment knob.We have to adjust the knob as per the refrigerant we are using and temperature that required.Some it already adjusted by company for specific refrigerant and temperature but some time we have to adjust. How to rotate that knob shown in below image.

The approximate superheat or expansion changes per turn of knob for different gases shown in below image.

Comments

Popular posts from this blog

How to control Temperature and Humidity in Air Handling Unit

  How to control Temperature and Humidity in Air Handling Unit Overview Air Handling unit is a system used to supply temperature and Humidity controlled filtered air to the cleanroom. For air filtration various types of filters are used in AHU. And for temperature and Humidity controlling cooling and heating coils are provided in AHU. Goals Control the temperature of air used in the cleanroom  Control the humidity of air used in cleanroom  Air filters Specifications    The air Handling unit consists of Air filter  Cooling coil Heating coil Air blower HEPA Filter  Controlling of Temperature and Humidity  By Cooling Method  The cooling coil recirculates the chilled water having temperatures between 4°C to 6°C. This chilled water comes from the Chiller through centrifugal pumps. When we start the Air Handling unit blowers sucks the air through the pre filters of the air Handling unit. When blowers sucks air, it passes through the cooling co...

Why ice forms at cooling coil and Suction line in Refrigeration system

 Why ice forms at cooling coil and Suction line in Refrigeration system       it's all about the relationship between a temperature and pressure and how the pressure affect the boiling point of the refrigerant. As the pressure of refrigerant increases then the temperature and boiling point also increases,  when pressure decreased temperature and boiling point also decreases. Refrigeration and air conditioning systems take use of it to cool the air or liquid.   Normal Refrigeration System      In normal refrigeration system compressor compresses the refrigerant which causes the increase in pressure and temperature of refrigerant. The hot vapour refrigerant pass through the condenser in condenser heat exchange happens and refrigerant condensate into liquid forms.Before entering in the evaporator high pressure liquid refrigerant pass through the expansion of valve. The actual device used depends on the Refrigeration system but capillary t...

HVAC Validation In pharma Industries

HVAC VALIDATION As per ISO guidelines for HVAC validation. In HVAC Validation  below points are determined and validated that they are in within range as per designed which will pass the respective ISO standard class acceptance criteria. 1)Air velocity and CFM calculation 2)Air changes per hour 3) Installed filter leakage test 4) HEPA filter integrity test 5)Air flow pattern test or smoke test 6)Partical count test 7)Total variable count 8) Temperatur and pressure monitoring 9) Temperature and Humidity recovery test 10) Fresh air calculation All this points are determined recorded in documents.All this validation process done by validation contractors under observation of respective company Engineer. 1) Air velocity and CFM calculation :-   - Scan the area of the HEPA filter with probe of anemometer 6 inches from the filter face. - For accurate velocity take the velocity of air at five place of filters ( Four corners and centre of filter) - Record the air velocity i...